| 1. | The critical path method was originally developed to solve scheduling problems in an industrial setting . 关键路线方法最初的发展是为了解决一项工业安装的安排问题。 |
| 2. | Allen's path, which we have shown in boldface type, is the only critical path in the project of travelling to los angeles . 爱伦的路线是到达洛杉机商谈工作的唯一关键路线,在图上用粗黑线表示。 |
| 3. | Show the critical path across inserted projects 显示穿过多个插入项目的关键路径 |
| 4. | Get risky operations off the critical path 使用mq以从关键路径去除风险大的操作 |
| 5. | Shorten the durations of tasks on the critical path 缩短关键路径上的任务工期。 |
| 6. | Assign additional resources to critical path tasks . . 为关键路径任务分配其他资源。 |
| 7. | Analyzing and practicing for critical paths calculation 数据结构中关键路径算法的实现 |
| 8. | The critical path has been shortened as much as possible 关键路径已经尽可能地缩短。 |
| 9. | Each task on the critical path is a critical task 关键路径中的每个任务都是关键任务。 |
| 10. | A new algorithm for finding the critical paths 一种新的关键路径求解算法 |